Can you queue on a run after a trial injection?

Putting on a trial injection of 30 minutes and I want to put on a few runs after it. I don't want to abort the injection after my main peak (paperwork reasons and SOP) so can I just load up sample sets and activate them so that they will acquire right after the trial injection is over?

Best Answer

  • Yep. Just load, hit green button, repeat. The only difference is don;t choose a shutdown method until the last one. 

Answers

  • And if you queue in the incorrect order, you can simply click the sample sets tab of the instrument window and use drag and drop to rearrange.
  • Thanks very much guys.