Calculate "peak-to-valley" ratio in Empower 2
Best Answer
-
Hi
I think this is what you are looking for (found in Empower help - "verifying system performance" topic) :
New peak fields
Empower can calculate the Start p/v and End p/v using the peak-to-valley ratio (p/v) formula in the European Pharmacopeia. Empower calculates the start p/v and End p/v as follows:
Start p/v = (height / heightstart)
End p/v = (height / heightend)
where:
height = height of the peak,
heightstart = valley height at the start of the peak
heightend = valley height at the end of the peak
Both fields are reported by default with a precision of 6, not in scientific notation, and with no units. The fields are blank if their denominator value is zero.
I don´t recall in what service pack or feature release this was introduced. I have FR 5 service pack E.
best regards
Rune
0
Answers
-
Thanks Rune, this was very helpfull.
Peter
1